Planning Production Rates
Task / Description | Slow | Ave | Fast | Units |
Metal KwikStage, 5 Boards with 2m lifts | 11.1 | 11.9 | 12.5 | m run/hr |
Metal KwikStage, 5 Boards with 3m lifts | 9.1 | 10.0 | 10.5 | m run/hr |
Metal KwikStage, House Scaffold with 3 lifts | 2.8 | 3.2 | 3.8 | m run/hr |
Metal Tube and Fittings, 5-6 Boards wide | 3.2 | 3.7 | 4.6 | m run/hr |
Tube and Fitting Platforms, 50-250m3 | 10.6 | 12.5 | 18.5 | m3/hr |
Tube and Fitting Platforms, 250-1000m3 | 18.5 | 22.5 | 24.5 | m3/hr |
Tube and Fitting Platforms, over 1000m3 | 24.5 | 30.0 | 33.5 | m3/hr |
Tube and Fitting Platforms, striking | - | 200.0 | - | % x erect |