Excavate Spoil Heaps to Transport, 0.6m3 bucket, Sand/Soil |
14.5 |
20.0 |
25.6 |
m3/hr |
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Gravel Beds |
15.2 |
20.4 |
25.6 |
m3/hr |
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Clay/Chalk |
12.3 |
18.5 |
23.2 |
m3/hr |
Excavate Spoil Heaps to Transport, 0.6m3 bucket, Boulder Clay |
11.2 |
16.9 |
21.3 |
m3/hr |
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Sand/Soil |
25.4 |
30.3 |
35.7 |
m3/hr |
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Gravel Beds |
25.6 |
31.3 |
37.0 |
m3/hr |
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Clay/Chalk |
22.5 |
27.8 |
33.3 |
m3/hr |
Excavate Spoil Heaps to Transport, 1.1m3 bucket, Boulder Clay |
18.9 |
24.4 |
30.3 |
m3/hr |
Load Spoil to Barge, capacity 2,000m3 |
- |
8.0 |
- |
hrs |
Load Spoil to Barge, capacity 1,500m3 |
- |
6.5 |
- |
hrs |
Load Spoil to Barge, capacity 1,000m3 |
- |
5.5 |
- |
hrs |
Spoil conveyor, 600mm belt, 150m/min |
- |
260.0 |
- |